How it works

From empty keys to first guest.

One team takes the apartment from brief to a photographed handover. Typical timeline: two to three weeks from design sign-off, depending on how much you customise.

  • Free site visit
  • Fixed, itemised quote
  • Made in 5 to 7 working days
  • Two to three weeks from sign-off

Five steps

One brief, one quote, one handover.

Heavily customised pieces can take longer than the times below, and we tell you before you sign.

  1. Day 1

    Brief and site visit

    Tell us the unit, the building and the guests you want. We visit to measure and photograph the space.

    • A free site visit to measure and photograph the apartment
    • Your guest count and the holiday-home category you are aiming for
    • Your keys or handover date, so the plan works back from it
  2. A few days

    Design and fixed quote

    A layout, a mood board and an itemised quote. Pick Essential, Signature or Luxe, and swap any piece.

    • A layout and a mood board for the apartment
    • An itemised quote, piece by piece, with VAT on its own line
    • Payment stages and warranty terms written into the quote
  3. 5–7 working days

    Made to order

    Furniture is built in the UAE to your sizes, fabrics and finishes. Typical production is 5 to 7 working days.

    • Built by our UAE manufacturing partner after you sign off the design
    • Your sizes, fabrics, colours, wood and leg design
    • Curtains and blackouts made to measure for every room
  4. 1–2 days

    Install and style

    Delivery, assembly, curtains, lighting and styling, usually finished in one to two days.

    • Delivery, assembly and installation
    • Curtains, lighting, art and styling
    • Wall accents fitted, if you added them
  5. 1–2 days

    Clean, shoot, hand over

    A deep clean, a professional photo shoot and your inventory list. Ready for the first guest.

    • A deep clean before the shoot
    • A professional photo shoot for your listing
    • Your inventory list, ready for your PMS and check-out audits
    • The safety kit in place, checked against DET's current classification checklist

Before we start

What we need from you.

  • The unit type, the building and the area
  • Your keys date or handover date
  • Access to the apartment for the site visit and the install
  • Your sign-off on the design before we order anything

After handover

Ready for your operator.

We furnish, style and hand over with the inventory list and the photos. If you need a licensed holiday-home operator, ask us for an introduction. When the listing needs a lift, a refresh brings new linen, décor and a fresh shoot, from AED 7,900 for a one-bedroom.

FAQ

Questions about the process.

Anything else, send it on WhatsApp and we will answer the same way: plainly, in writing.

All questions
How long does it take?

Most apartments take two to three weeks from design sign-off. Furniture is made to order in 5 to 7 working days, then installation, styling, cleaning and photography follow. Heavily customised pieces can take longer, and we tell you before you sign.

How does payment work?

Payment stages are written into your quote. We only order once you have signed off the design.

Is the apartment set up for Dubai holiday-home rules?

Every package includes the safety kit Dubai holiday homes are expected to carry: fire extinguisher, fire blanket, first-aid kit, a torch and gloves. Before handover we check the unit against the Department of Economy and Tourism's current classification checklist for the category you are aiming for.

Do you manage the apartment after handover?

No. We furnish, style and hand over. If you need a licensed holiday-home operator, ask us for an introduction.

Ready for your first guest?

Tell us the unit and the building. We reply on WhatsApp to book your free site visit, then send a fixed, itemised quote.